WHAT IS waterSHED™ TRACK RECORD ON ACTUAL PROJECTS?
STORMWATER DETENTION AND FILTERING
Project: Urban Retail Development
Need: 330,000 gallon underground stormwater detention to fit existing site topography
Solution: Triple-cell cast-in-place structure (27´ x 466´ footprint) per ASTM C 1433 with a 45 degree bend
Result: Significant cost savings and smaller footprint than the precast system
PRIMARY CONTAINMENT
Project: Municipal Wastewater Treatment Plant
Need: Primary containment for 40,000 gallons of brine
Solution: Below-grade twin-cell tank with access hatches
Result: Cost-effective structure with corrosion inhibiting admixture
SECONDARY CONTAINMENT
Project: Fortune 1000 Industrial Manufacturer
Need: Secondary containment for three 7,500 gallon tanks containing hazardous chemicals
Solution: Open-top 15,000 cubic foot structure
Result: Cost-effective and environmentally-friendly secondary containment that satisfies tough hazardous materials regulations
WATER TANKS FOR FIRE PROTECTION
Project: Industrial Plant Expansion
Need: 95,000 gallon water storage tank for fire sprinkling system
Solution: Underground triple-cell storage tank meeting NFPA 22
Result: Cost-effective, waterproof structure that precasters could not build