WATERSHED™ CASE STUDY #1622: NEW RETAIL BUILDING
| waterSHED™ | Plastic | |
|---|---|---|
| Installed Cost | 13% less | |
| Footprint | 729 s.f. (70%+ reduction) | 3156 s.f. |
| Durability | 100 years | 20-30 years |
| Flexibility | Concurrent with building foundation |
Deferred building foundation |
| Efficiency | Eliminated 6 catch basins | More components to purchase and assemble |
The ECS waterSHED™ Stormwater Detention System and design saved me money, and was more competitive than HDPE [plastic pipe].
The ECS design and installation team were fantastic and a pleasure to work with. I would recommend these guys to anyone!
Tim Smith
T.J. Smith Excavating, LLC
Chardon, Ohio
The waterSHED™ proprietary structural design optimizes stormwater release rates, filtration, and the isolation of sediment through a variety of integrated filtration and sediment trap structural BMP options.
With waterSHED™, maintainence is made simple; There are no clogs due to multiple pipe unions.
Read More About The waterSHED™ System
Click below to download a printable version:
waterSHED™ Cut Sheet
waterSHED™ Drawing Sheet
Optional Integrated Sediment Trap
Optional Integrated Biorentention Cell
Optional Integrated Sand Filter